Monthly Archives: September 2016

Phase 1 Design Engineering Walk Through

On May 16, 2016, HWPI secured a conditional commitment from the Michigan Department of Transportation for ~$1.8M to build Phase 1 of The Loop, a 4.7 mile trail segment starting from M-52 and Werkner Road and going north to North … Continue reading

Posted in Design Engineering, Phase 1 | Comments Off on Phase 1 Design Engineering Walk Through